AquaGuard Pro

Watergate Sonic Installation Process: Step-by-Step Guide

Our professional installation follows a proven methodology to ensure consistent, high-quality results while maximizing customer satisfaction. Here's what you can expect during your AquaGuard Pro installation.

Pre-Installation Phase

Timeline: 1-3 days before installation

  • Initial phone consultation to understand your needs
  • Site survey for complex installations (if required)
  • Detailed quotation and scheduling
  • Pre-installation preparation checklist

Initial Assessment (Day 1-2)

Customer Consultation

  • Conduct phone consultation to understand property needs
  • Discuss existing water system setup
  • Review customer's smart home integration requirements
  • Identify special considerations (high-value properties, previous water damage)
  • Confirm service package selection (Essential, Smart Home, or Premium)

Site Survey (If Required)

  • Schedule 30-minute site visit for complex installations
  • Locate main water supply pipe and stopcock
  • Measure available space for installation
  • Check water pressure and flow rate
  • Identify potential installation challenges
  • Take photos of installation area
  • Confirm WiFi signal strength at installation location

Quotation & Scheduling

  • Provide detailed written quotation including:
    • Hardware costs
    • Installation labor
    • Any additional materials needed
    • Timeline for completion
  • Collect 30% deposit to secure installation date
  • Schedule installation (typically within 5-10 business days)
  • Send confirmation email with date, time window, and technician details

Pre-Installation Preparation

  • Order Watergate Sonic device if not in stock
  • Prepare necessary tools and materials
  • Send customer pre-installation checklist:
    • Clear access to installation area
    • Ensure water stopcock is accessible and functioning
    • Secure pets during installation
    • Have WiFi network name and password available
    • Download Watergate app before technician arrival

Installation Day

Timeline: 2-5 hours depending on package

  • Professional arrival and setup (30 minutes)
  • Water system work and device installation (60-90 minutes)
  • Electronic setup and WiFi connection (30-45 minutes)
  • Smart home integration (if applicable)
  • Testing and customer training

Arrival & Setup (30 minutes)

Initial Procedures

  • Arrive within specified time window
  • Introduction and ID presentation
  • Brief customer on installation process and timeline
  • Lay down protective floor coverings
  • Photograph pre-installation area (for before/after comparison)

System Preparation

  • Unpack and inspect Watergate Sonic device
  • Verify all components are present and undamaged:
    • Sonic smart valve unit
    • Power supply unit
    • Manual override key
    • Mounting hardware
    • User manual and documentation
  • Set up tools and materials in organized workspace
  • Test electrical outlet near installation area

Water System Work (60-90 minutes)

Water Shutdown

  • Locate main stopcock/shut-off valve
  • Advise customer that water will be turned off
  • Shut off main water supply
  • Open a tap to release pressure and drain system
  • Place bucket under work area to catch residual water

Pipe Preparation

  • Measure and mark pipe for cutting
  • Cut pipe at marked locations (using appropriate cutting tool for pipe material)
  • Deburr cut pipe ends
  • Clean pipe surfaces thoroughly
  • Apply thread seal tape to pipe threads if required (PTFE thread should NOT be used)

Sonic Installation

  • Attach any required adapters to match pipe size
  • Install Sonic valve in-line with water flow direction arrow pointing correctly
  • Secure connections (tighten to recommended torque of 10 N·m)
  • Install any necessary pipe supports
  • Ensure unit is level and properly positioned

Leak Testing

  • Partially open main stopcock to pressurize system
  • Inspect all connections for leaks
  • Tighten any leaking connections
  • Once leak-free, fully open main stopcock
  • Check water flow and pressure

Electronic Setup (30-45 minutes)

Power Connection

  • Install power supply unit in appropriate location
  • Route power cable neatly (using cable management clips)
  • Connect power supply to Sonic valve
  • Insert backup batteries (if included in package)
  • Verify power indicator lights

System Initialization

  • Initiate system startup sequence
  • Calibrate flow sensors
  • Run diagnostic test cycle
  • Verify valve operation (open/close)
  • Test manual override function

WiFi & App Setup

  • Connect to customer's WiFi network
  • Register device in Watergate app
  • Link to customer's account
  • Update firmware if required
  • Verify remote connectivity
  • Test app controls (open/close valve remotely)

Smart Home Integration (30-60 minutes - Smart Home & Premium Packages Only)

Platform Integration

  • Configure integration with customer's smart home system:
    • Amazon Alexa
    • Google Home
    • Apple HomeKit
    • Home Assistant
    • Samsung SmartThings

Post-Installation & Follow-Up

Timeline: Immediate to 30 days after installation

  • Comprehensive system testing and customer training
  • Documentation and warranty information
  • Follow-up support and system optimization
  • Ongoing monitoring and maintenance scheduling

System Testing & Training

  • Complete system functionality test
  • Customer training on app usage and features
  • Emergency procedures explanation
  • Smart home integration demonstration (if applicable)
  • Manual override training

Documentation & Handover

  • Provide installation certificate
  • Hand over warranty documentation
  • Explain maintenance requirements
  • Schedule follow-up appointments
  • Customer satisfaction survey

Follow-Up Support

  • 48-hour check-in call
  • 7-day system performance review
  • 30-day optimization consultation
  • Ongoing technical support
Water-Filled Pointer Shield graphic